Shell Floats Hull of Enormous Rig

shellRoyal Dutch Shell PLC says it has completed building the hull of the world’s largest floating facility, which has been constructed to process natural gas off the coast of western Australia.

Shell said Tuesday that the 488-meter (1,600 foot) hull of the structure, known as “Prelude,” was floated out of the dry dock in Geoje, South Korea where it is being built.

Prelude is designed to take in the equivalent of 110,000 barrels of oil per day in natural gas and cool it into liquefied natural gas for transport and sale in Asia. It will float above gas fields.

Shell says it can remain in place through a category 5 cyclone.

Construction began last year, three years after the project was announced. Gas production is slated to begin in 2017.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s